MINING

Mt Thorley

Project Overview: Install of 4x180m electrical conduit PN12.5 HDPE under road at Yancoal’s Mount Thorley mine. Bore diameter expanded to 550mm using one of Maxibor’s Vermeer 100x120 horizontal directional drilling rigs.

 

Location: Mt Thorley NSW

Ground Conditions: Hard rock +60mpa

 

Asset Owner: Yancoal

Length: 180 metres  Pipe: 4x180mm

yancoal-logo.jpg
Ravensworth

Project Overview: Install of Installation of 140m of 63mm & 80m of 110mm communication conduit as part of Telstra services relocation at a ULX rail crossing and creek crossing.

 

Location: Ravensworth NSW

Ground Conditions: OTR

 

Asset Owner: Glencore

Length: 223 metres  Pipe: 63mm and 110mm

Glencore.png
Mt Pleasant

Project Overview: Supply and install of 630mm HDPE PN12.5 SDR 13.6 pipe for series of eight bores at Hunter Valley mine site.

 

Location: Mt Pleasant NSW

Ground Conditions: OTR and rock

 

Asset Owner: Glencore

Length: 490 metres  Pipe: 630mm

Yore.jpg

More Info?

If you would like further information on any of our projects please feel to contact our Maxibor HDD expert David Turner on 0499 375 511 or click here and we will be in touch. 